Friday, September 4, 2009
Watching the pigskin
Sunday, August 23, 2009
Swing when your winning
Finished the last few jobs on the swingset just hours before the deadline of Sofie's 5th birthday party. We had about 20 kids plus parents round and it was CHAOS and matters weren't helped when a passing thunderstorm came over and so everyone crammed on to the back porch and then inside the house.
Kids go back to school tomorrow not a moment too soon either. I'm hoping that the house no longer resembles Beruit when I come home from work every day, but I'm not going to hold my breath.
Sunday, August 16, 2009
Construction day 2
Secondly and more importantly SNAKES. Mrs P came out to look at my progress and saw a snake in the grass at the marsh edge. We watched it slither along and it was a harmless Southern Black Racer. All of a sudden another snake shot out from the water's edge and the two fought it out. There was a ton of thrashing around but the Southern Black Racer stood no chance against the viscious and VENOMOUS cottonmouth. We watched as this snake started to eat the other one whole. All this took place about 10 ft from where I was working and trust me I'm no fan of snakes in general but venomous ones are just a big fat NO. The kinda slowed me down as I was on the constant look out for more hissing Sids.
Anyway I didn't get time to put the wood roof on so the coloured tarp was installed instead, I still need to stake the whole thing to the ground, stake the bottom of the slide and drill and install the swing chair for Charlotte.
Saturday, August 15, 2009
Construction day 1
Several hours later and we're at this stage. Tomorrow's work is to construct an A frame for the swing rail support, fit swing rail and swings, construct the stairs, attach the rock wall, attach the slide and if I get a chance construct the wood roof. If time is short I'll be using the tarp that the send with the kit, the wood roof is considered optional but it will last longer.
Thursday, August 13, 2009
Well construction begins...
If you're wondering about the tenon saw it's because my circular maxes out at a 2" cut (and I'm not sure it really cuts that deep) and anything slightly over this requires some hand intervention.
I've got another problem too, I used the list of required lumber on the website and it's different from that contained in the construction manual. I'm supposed to use 5/4" x 6" for the roof but the website said use 2" x 6" and this is what I've already bought. I can't face taking it back so the roof will be solidly constructed and possibly a little top heavy.
Wednesday, August 12, 2009
This weekend's work..
Wednesday, July 29, 2009
It never strikes twice
On the way home there was thunder and lightning going on and as I stopped at a set of traffic lights I saw a lightning bolt strike a power transformer on a telegraph pole not 50 yards from me. And yes, just like in the films, there was a big puff of smoke, plenty of sparks and then it caught fire!
