Monday, May 19, 2008

How To...

...install a garbage disposal.

This was easier than I thought, luckily someone had already installed the power on a separate fused circuit and the switch was wired in too. All I had to do was change the face plate for a socket and mount it properly to the wall.


Existing pipework removed and new socket installed and tested.

The mounting bracket installed underneath sink.

New garbage disposal installed in position

Luckily I had enough pieces left over from the original pipework to finish off the drainage and connect the dishwasher


Job done and Mrs P over the moon, and I quote this is what "sorts the middle class from the lower class".

Sunday, May 18, 2008

Handy man

This weekend has been incredibly busy.

So far this weekend I've done the following DIY jobs:

  • finished off making my workbench complete with power sockets (pics to follow)

  • installed a new garbage disposal system (pics to follow)

  • installed a new shelf in the cupboard under the sink

  • boarded part of the attic floor (this wasn't fun as it was 80F outside and the temperature in the attic was another 10-15 degrees hotter. I was sweating buckets and went through 2 t-shirts)

I've also shifted several boxes of books and other stuff up into the attic.

Mrs P entered her first triathlon this morning and left the house at "stupid o'clock". The kids and I travelled down at a more reasonable 8:45 to watch her finish. It was only a small race but ideal for her first try, she was first in her age group too. Her friend Rachael (who's persuaded her into these events) was the first woman home too. Well done to both of them! Now she wants a proper road bike but we've no where to store it in the house and if we leave it outside it will rust in minutes.

Mrs P also turned up with a new surfboard this week which she got a bargain on at $75. It needs a bit of work as the deck has started to delaminate from the center of the board. I'm on the case and I'm reliably informed that if I inject some fibreglass resin in the gap and then put a heavy weight on it it will fix it perfectly. I've bought the resin and a seasoning injector (see below) and will try a Re-Animator style operation. I need to get this done some time this week as it's Memorial Day next monday and we've all got the day off work. Time to hit the beach and start surfing.


Monday, May 12, 2008

That'll be a pound....

Well there was no Mr Fiddler in sight and camping was a great success. The tent is massive and is pretty easy to get set up. We didn't really forget anything too important and a good time was had by all. We may have only been 3 miles up the road but on Saturday evening we sat on the beach and watched the dolphins swim by...could it get any better?

Sunday was Mother's day and I treated Mrs P to something she's always wanted.... a garbage disposal system. I know can hear you all saying what an old romantic I am, some people have to work at it but it comes easy to me. I'll try and find a couple of hours this week to install it.

The Beast has developed a small coolant leak from behind the timing chain cover. I've studied the Haynes manual in great depth and it's a pain in the neck to fix. To get to the water pump I have to remove the fan and possibly the radiator too (to gain some extra access space as I don't want to put a hole in it). If I have to remove the radiator then I'll have to drain the A/C too (that's under high pressure and it's illegal to vent it to the air). Having got those out I have to remove the sump pan to get the timing cover off. This is the killer step as I have to drop the exhausts from the manifolds and disconnect a whole heap of other stuff. All in all it's just too much for me to get done in a weekend and I probably haven't got the right tools here so I'll leave it till I have too and then pay someone to fix it.

Saturday, May 10, 2008

Film 08, da...da...daaah

Cloverfield = TRASH. We rented this last night after both Mrs P and I missed it at the cinema and we both wanted to see it. It was utter rubbish and after 30 minutes I'd had enough (it's only 80 minutes long) and I gave up to read my newly purchased Haynes manual for the Beast. Mrs P bravely carried on watching but her final review was '...sucks, but there were a couple of good bits."

Its supposed to get up to 93F today which is going to be mighty hot especially as we're going under canvas tonight. Our friends are going with their two daughters so should be good fun. Mrs P wants to take the surfboard too but I've no idea where we're going to store it overnight.

Wednesday, May 7, 2008

As promised

Here are the pictures of Mrs P's birthday cake. If you can't work out what it is, or you're not a fan of the show (I'm not but Mrs P LOVES it) then its the island from Lost, complete with plane crash and polar bear. If you're wondering about the black splodge in the top left corner it was supposed to be a Dharma Initiative logo but leaving the cake out of the fridge for a couple of hours put paid to that.



Mrs P has also booked a campsite for Saturday night. It's only a couple of miles away so if it all goes horribly wrong then there's an escape plan. Sunday is Mother's day so I need to get my act together for that too.

Monday, May 5, 2008

Ramble on

Sunday was a busy day all round. I finished off making the framework for a new workbench and just need to get some plywood to put a top and shelf on it. After this we all went to the beach for a couple of hours and met up with some friends.

Mrs P wants to go camping as soon as possible and is really keen to go this weekend, so I insisted that we try and put the tent up first in the privacy of our back yard so as not to look like complete noobs. This was a great idea only flawed in its execution as the tent is bigger than the yard so we didn't manage to get it fully erected. But all the parts are there and we think we now know what we're doing.

Last night we all dined on snowcrab legs. The grocery store had an offer and they were reduced to $5/lb so we helped ourselves to 3 lbs. We do need to get some proper crab/lobster crackers though as using my pliers isn't the best or most hygenic solution!

Yesterday evening was spent trying to sort out the HR paperwork from the new job. Trying to wade through the information on health insurance policies is just a nightmare! Add on to that trying to work out how much tax they need to withhold so that I don't end up with a hefty tax bill at the end of the year is just a headache. Mrs P's take is to withhold more so you get a bigger rebate but most of it is guess work. Still I get paid on Thursday so it's happy days all round

Saturday, May 3, 2008

Sugary nonsense

Well that's my first week of work out of the way and glad it's the weekend. Friday's at work is officially dress down day and jeans and tshirts are the order of the day. I sort of knew about this but wasn't sure so I played it safe with pants and a shirt. All day everyone kept saying "You know its jeans day today?"

Anyway this afternoon we're having a family get together to celebrate Mrs P's birthday. I'm on cake making duty and a killer of a cake planned. I don't want to give the game away now so photos to follow later.
Talking of food look at this new cereal...it truly is the breakfast of kings...